| Customization: | Available |
|---|---|
| After-sales Service: | 12 Months |
| Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Trash Bin Hooking Operation Procedure
| Step | Phase | Action / Description | Key Points / Notes |
|---|---|---|---|
| 1 | Pre-Operation Check | Observe road conditions before any operation (hooking, unloading bin, unloading materials). | Check if road surface is solid, level, on a slope, or has a cliff behind. Avoid operation if unsafe. |
| 2 | Vehicle Setup | Park 3-5 meters from bin. Depress clutch, engage PTO switch, select low forward gear. Gradually increase engine speed (gears 1-4, using only low range for PTO). Release clutch to operate arm oil pump. | Ensure vehicle air pressure is normal. Only use low-speed forward gear for PTO operation. |
| 3 | Positioning & Hooking | 1. Rotate remote "Lock Hook/Release" button, then fully release hydraulic lock. 2. Rotate "Boom/Retract" to fully retract boom. 3. Rotate "Boom/Raise"; boom flips backward. (To speed up: engage gear and accelerate). 4. Near bin hook, release throttle. Gently rotate "Lift/Unload Bin" to align boom hook with bin hook. 5. Release button, engage reverse gear to slowly insert boom hook fully into bin hook. |
Align hook opening carefully. Use reverse gear for final engagement. |
| 4 | Stabilize Vehicle | Pull hand brake (mind clutch usage). Engage forward gear. Rotate "Leg" button to fully extend and support the rear outriggers. | Ensure vehicle is stable before lifting. |
| 5 | Lifting & Securing Bin | 1. Rotate "Boom/Lower" button and accelerate to lift bin hook quickly. 2. Observe alignment of bin guide rail with rear guide wheel. If misaligned, pause, move vehicle slowly forward to correct. 3. Continue "Boom/Lower" until bin is fully lifted onto vehicle. 4. Release button. Hold "Boom/Extend" to move bin slowly to foremost position. 5. Release button. Rotate "Lock Hook/Lock" button to lock bin. 6. Rotate "Leg/Retract" to fully retract outriggers. |
Critical to check guide rail alignment. Ensure bin is locked and outriggers retracted before transport. |
| 6 | Transport to Unload Site | Depress clutch, disengage PTO switch. Select appropriate forward gear. Transport bin/compaction container to unloading site. | Avoid sharp braking, sharp turns, and high speeds during transport. |
| 7 | Unload Site Setup | Reverse to designated spot. Engage neutral, pull hand brake. Connect vehicle's spare hydraulic hose quick connector to the bin's quick connector (check for match initially). Engage PTO gear and fully extend rear support (as before). Tap "Leg" button to fully open the bin's rear door. | Ensure quick connectors are properly matched and connected. |
| 8 | Unloading | Rotate "Boom/Raise" button to put the container into self-dumping state. Fully unload trash/materials. | |
| 9 | Post-Unloading Reset | 1. Rotate "Boom/Lower" button until container fully returns. 2. Rotate "Leg/Retract" to fully retract legs and fully close/lock the rear door. 3. Disconnect quick connector from bin and secure it on the vehicle. |
Ensure rear door is closed and locked. Secure hydraulic hose. |
| 10 | Return & Shutdown | Transport bin/compaction container back to required placement location. Repeat steps (presumably for unhooking) to unload the bin, completing work cycle. Finally, turn off control box, disengage PTO gear. |